Protect yourself from COVID – 19 by doing the following: 1. HANDS: Wash Them Often 2. ELBOW: Cough Into It 3. FACE: wear mask 4. SPACE: Keep Safe Distance 5. HOME: Stay If You Can. For more information visit: www.health.go.ke/home/, www.who.int
Feasibility Study and Design of a Briquette Manufacturing Plant

Feasibility Study and Design of a Briquette Manufacturing Plant

Name of Client: Lake Basin Development Authority

Narrative Description of Project: The broad objective of the consultancy was to carry out a detailed feasibility study to establish the financial, economic, social, technical and environmental viability and develop a detailed project implementation plan for a briquette manufacturing enterprise in Kisumu and any other potential sites in the region

Description of Actual Services Provided by Our Staff: The specific tasks included the following:

    1. Undertaking feasibility study and preparation of detailed designs for the proposed project.
    2. Preparation of a cost-effective implementation program
    3. Conducting an Environmental and Social Impact Assessment
    4. Proposing a legal and institutional arrangement for project management and supervision
    5. Preparation of technical guidelines and tender documents for implementation of the project
    6. Producing a design that embraces green growth and Clean Development mechanism
    7. Preparing a bankable document that could be used to source for funding of the project
    8. Establishment of the possibilities of registration of the project in the carbon trading framework

Country: Kenya

Location within Country: Kisumu County

Start Date: 2013

Completion Date: 2013